How we install, not just what we install

FROM SURVEY TO
SWITCH-ON

One team does the survey, the design, the install and the paperwork, so nothing gets held up waiting on a subcontractor or a third party. Here's exactly what happens, in order.

Residential rooftop solar array installed by MD Renewable
01
Free site survey, about 45 minutes
An MCS-registered engineer checks your roof pitch, orientation and shading, looks at your consumer unit and a recent bill, and gives you a fixed, itemised quote before they leave. Not a follow-up email a week later.
02
Design & scaffold
Your system is sized to your actual usage from the survey, not a generic package. Scaffolding is booked in ahead of install day so the crew isn't standing around waiting for it to go up.
03
Panels and inverter go in, one to two days
Panels go on the roof first, then the inverter, typically a SunSynk hybrid unit like the one pictured, gets wired into your consumer unit and battery if you're having one fitted. Most domestic jobs are done in a single day; larger systems can run into a second.
SunSynk hybrid inverter being installed
04
MCS certification & DNO notification
We submit your MCS certificate and the G98/G99 notification to your network operator ourselves. That's what makes you eligible for export payments from day one, not weeks later while paperwork catches up with someone else.
05
Handover
Before we leave, you're shown exactly what you're looking at on the inverter display, like the live generation reading pictured, how to read the same numbers in the app, and where your warranty paperwork is. We're a phone call away after that, not a call centre.
Live solar generation data on inverter display
A different kind of roof

COMMERCIAL & LARGER FLAT ROOFS

Commercial flat roof solar installation

The same process applies, but the details change: flat roofs use ballasted or mechanically-fixed mounting frames instead of pitched-roof brackets, and larger arrays usually mean a three-phase or multiple-inverter setup rather than one domestic unit.

Timelines run longer, from a few days to a couple of weeks depending on scale, and we'll walk through the specifics at survey stage rather than quote blind from a phone call.